Container house as a temporary building
Widely used in various scenarios
Container house as temporary building
It is also necessary to follow the principle of "who installs, who removes" when special circumstances arise
If the overall stability of the container library is unsafe
The principle of "reinforcing first, dismantling later" must be
Container house demolition before construction
The construction unit as the main body of demolition
Demolition plans must be drawn up in advance and safety procedures
At the same time, it should be
Dust and noise reduction, stacking, and garbage removal and other related measures
Before the official demolition of the container house
It must be ensured that the removal of
Water, electricity and gas are cut off in advance
After the demolition work begins
The distribution box in the demolished container house shall not be used
Fences should be set up around the demolition area of the container house
Hanging warning signs and send people to supervise
Unrelated persons are not allowed to stay
Temporary buildings to be demolished in bad weather
(such as strong wind, fog, rain and snow, etc.)
Fences should be set up around the demolition construction area
Hanging warning signs
And send a special person to supervise
It is strictly forbidden for unrelated persons to stay
Encounter level five or above
In severe weather such as strong wind, fog, rain and snow
Demolition of temporary structures is prohibited
If the container house is demolished more than two meters in height
Staff should be on specially constructed scaffolding or on stable structural components
Operation is strictly prohibited
Person standing on demolished container house operate
The integrated house has its own
Fireproof, heat insulating rock wool and color steel plate processing container room partition, fire escape configuration,
Number of fire compartments, fire stairs and configuration of fire equipment
Location and quantity, etc. need to meet relevant requirements
How to ensure safety during construction, packing box manufacturers should take the following measures:
①The construction personnel of the packing box house must do three-level safety education and train safety techniques before taking up their posts;
②Professional operators must hold certificates during construction operations: wear rubber-soled shoes, safety helmets, and safety belts, and safety nets must be set up as required;
③ It is forbidden to walk under the construction floor;
④The box-type room can only be unpacked when laying, it is forbidden to have box-type rooms that are not welded and fixed, and it is forbidden to use the box-type room as a temporary passage to pass through;
⑤ The opening of the box-type house shall be closed in time after laying, and guardrails shall be set up and marked.