Prefabricated modern luxury flat pack container house
20ft prefabricated container house is built with cold-rolled steel plates and use sandwich panels for wall insulation. MOQ:1 set
item no.:
container house16lead time:
7-15daysproduct orgin:
Chinashipping port:
Xiamen/Qingdao/Tianjin,Chinapayment:
T/T;L/C at sightcolor:
CustomizedAdvantages of Container House:
☆Prefab :
Preinstalled electrical and plumbing,time saving.
☆Movable And Disassemble:
Can be separately according to your requirements.Easy install, transport and relocate.
☆Economical and environment friendly:
Short construction period and little workers, can be relocated with no waste.
☆Convenient transportation,:
Can be transported as a shipping container, or flat packed.
☆High strength:
Live load capacity of roofing: 0.5KN/㎡. Second floor load capacity: 150kg/㎡.Load bearing capacity greater than 40t. Live load of corridor/ balcony/walkway is 2.0KN/㎡
☆Waterproof, fireproof,seismic resist:
Its wind resistance Grade 11 (wind speed≤ 111.5km/h)
☆Earthquake resistance:
Grade 7, External and internal wall heat transmission coefficient: 0.35Kcal /㎡hc
☆Long life-span: up to 20 years.
☆Customized: Various design as per your preference.
☆Little requirements on ground:Being tough and flat is OK.
Flat Packed Container Materials :
Material Item
Standard
Structural steel properties
Not less than Q235 steel in GB/T 700, the allowable deviation of the thickness of the steel plate meets the requirements of GB / T3524-2005.
Fiber cement slab for floor
Meet the requirements of JC / T 412.1-2006 high density
non-asbestos fiber cement slab.
Color steel sandwich panel for interior wall panel or ceiling panel
Complywith the requirements of GB / T12754-2006, the core material should be
made of non-combustible materials
Color steel plate for roof covering panel
Meet the requirements of GB / T 12754-2006, and the substrate
coating is not lower than the requirement of corrosive environment
for intermediate level.
Particleboard for interior wall panels or ceiling panels
Meet the requirements of GB / T 4897.3-2003
Galvanized steel sheet for bottom sealing plate
Meet the requirements of GB / T15675-2008.
Insulation rockwool/glass wool
Meet the requirements of GB / T 11835-2007
Interior corner PVC profiles, skirting lines, door and window cover lines, etc.
Meet the requirements of GB / T 8814-2004.
Performance level of ordinary fasteners for connecting corner posts and top and bottom corner pieces
Not lower than the requirements of level 4.8 in GB / T 3098.1-2010 and GB / T 3098.2-2000
Self-tapping screws
Meet the requirements of GB / T 15856.5
Blind Rivets
Meet the requirements of GB / T 12618.1
Welding of steel structures
There should be no undercuts, root shrinkage, crater cracks, slag inclusions
on the surface, blowholes, false welds, missing welds,
etc.
PVC floor panels for floor decoration
Meet the requirements of GB / T 11982.1-2005
Other Container House Design :
☆Packing:
If standard size,we can load max 15 sets of container.
☆Delivery:
Delivery time for regular designs and colors:7-10 days;
Delivery time for special designs and colors:15-20 days;
Delivery term:FOB/CIF/CFR/DDP is available;
We can find good forwarder for customer or accept appointed forwarder from customers.
FAQ:
Q: What’s the minimum order quantity (MOQ)?
A:1 unit.
Q: What’s the quality grade of the steel structure components?
A: Normal use Q235B.
Q: How to install the house?
A: The detailed construction drawing and installation video will be provided.
If necessary technicians will be sent to help you. But the visa fee, air tickets, accommodation, wages won’t be included in the EXW price.
Q: Could you please design a new and unique prefab house for me?
A: Absolutely! We are able to provide you with not only a construction scheme but a landscape design! One-stop service is our outstanding superiority with no doubt.
Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 80 square meter house five workers 5-10days finished installation, save manpower and time.
Q: What are the advantages of prefab house compared to the traditional building?
A: Better isolation of sound and heat, Better fireproof and anti-seismic, Wind resistance, Time and labor saving, More usable area, Excellent termite-proof capability.
Q: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterward, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally, we make a deal.
Project details ---> Drawings for your project ---> Revised drawings ---> Transaction confirmation with Trade Assurance
Q: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 15-25 days after receiving the deposit.